Skip to content
ChronoClockTime intelligence
UTC
--:--:--
UTC
--:--:--

GuidesResearch-backed productivity articles
TemplatesPrintable planners and trackers
  1. Home
  2. ›Templates
  3. ›Printable Eisenhower matrix grid

Printable template

Printable Eisenhower matrix grid

A blank two by two grid for sorting a pile of work by urgency and importance, with six writing lines in each quadrant.

Eisenhower matrix

Sort by urgency and importance

Date
Urgent and important

Do first

Today, by you, before anything else on this page

Important, not urgent

Schedule

Give each item a date and a start time

Urgent, not important

Delegate or shrink

Hand it over, or cut it down to the smallest version that works

Neither

Drop

Cross it out and stop carrying it around

Write every open task on the back of this page first, then copy each one into exactly one quadrant.

How to use this template

The matrix is a sorting exercise, not a to-do list. Its value comes from forcing a single decision about each item: important means it moves something you care about forward, urgent means someone will notice if it is late. Those two questions are easier to answer separately than together.

  1. Empty your head onto the back of the sheet first. Every task, message and half-idea, in any order, before you start sorting.
  2. Take each item and ask whether it is important, then whether it is urgent. Copy it into one quadrant only. An item in two places has not been sorted.
  3. Work the "do first" quadrant today. If it holds more than a day of work, the sheet is telling you something, and the fix is to move items down rather than to work faster.
  4. Give every item in "schedule" an actual date and time before you leave the sheet. An unscheduled item in that quadrant drifts up into the urgent one later.
  5. For "delegate or shrink", write the name of the person next to the item, or write the smaller version of the task you are willing to do instead.
  6. Cross out everything in "drop" with a line. Keeping the crossed-out list visible is what stops the same item coming back next week.

A worked example: a Monday sheet has "fix the failing deploy" in do first, "write the hiring plan" in schedule with "Thursday 9:00" beside it, "book the offsite venue" in delegate with a colleague's name, and "reorganise the shared drive" crossed out under drop. Four items, four different decisions, and only one of them belongs to today.

The quadrant most people underfill is "schedule", and it is the one that prevents next month's emergencies. The Get It Done tool runs the same sort on screen, with the capture step and a weekly review.

Reading the sheet after you have used it

Keep the filled sheet for the rest of the week and leave it where you can see it. It is a record of decisions rather than a scratch pad, and its main job starts after the sorting stops.

Tick items in the top-left quadrant as they go, and on Friday count the work you actually did that never appeared anywhere on the page. That count is the size of the work arriving after the sort, and it is the number that tells you how much of a week is realistically plannable. Somebody whose sheet covers a fifth of their week should plan a fifth of it.

Then look at what moved. An item that started under schedule and ended up being done in a rush was not an emergency; it was a scheduling failure, and the date beside it says when the failure happened. Those are the items to look at first, because they are the ones the sheet was drawn to prevent.

Compare the new sheet against the last two before you throw the old ones out. An item sitting in schedule for a third week has now been quietly declined three times, and writing it in a fourth quadrant is more honest than writing it in the same one again. The crossed-out quadrant deserves a second read for the same reason: something you dropped a fortnight ago and are still thinking about was probably important after all.

Sorting mistakes

Sorting by how a task feels instead of by the two questions. Dread is not importance, and the item you least want to touch is as likely to be a twenty-minute phone call as a week of work.

Writing a project into a quadrant. Quadrants hold actions, and "the website" cannot be done first, scheduled, delegated or dropped. Sorting a project always produces a stuck sheet, because every quadrant is partly right.

Leaving the drop quadrant empty. A sort with nothing dropped has moved items around without deciding anything, and the page will look identical next week. If genuinely nothing can go, the honest version is to write that on the sheet.

Running the sort on the day you are already behind. Triage done in a panic reproduces the panic: everything lands in the top-left quadrant because everything feels urgent at four o'clock on a bad Thursday. A quiet hour produces a different and better sheet from the same list.

Adding to yesterday's sheet rather than printing a new one. Six lines a quadrant is a budget, and overrunning it turns a triage sheet back into the backlog you were trying to escape.

Printing notes for the matrix

Print this one single-sided and leave the reverse blank. The capture step happens on the back of the page, and a double-sided print leaves you with nowhere to empty your head and no reason to do the sort properly.

There are twenty-four writing lines on the page, six to a quadrant, and they are deliberately narrow. A task that will not fit on one line of ordinary handwriting is too big to sort, so the ruling is doing part of the thinking for you before you have decided anything.

One sort a week means this is the sheet to print one copy at a time rather than in a batch. Some of the value comes from having to go and fetch a fresh page, which is a small deliberate act that a stack on the desk removes.

A finished matrix is worth more than a finished planner, because it holds decisions rather than intentions. If you keep anything from a paper system, keep these: photograph the sheet before it goes in the recycling, and the record costs you nothing.

Frequently asked questions

How do I tell urgent from important?

Urgent has a deadline attached to it, usually someone else's. Important changes an outcome you chose. A colleague's request due at 17:00 is urgent; the strategy document with no deadline is important. Most of the work that goes badly is important work that was never urgent until it was.

Everything looks urgent and important. What now?

That usually means the items are too big. Break each one into the specific next action and sort those instead. If the top-left quadrant is still full, you have a workload problem rather than a prioritisation problem, and the sheet is useful evidence for that conversation.

How often should I redo this?

Once a week is enough for most people, with a fresh sheet rather than an edited one. Copying the surviving items by hand is the part that makes you notice the task you have carried forward four weeks running without touching.

Can a team run this on one sheet?

Yes, with one change: write an owner's name beside every item before anybody leaves the room. Without names, the delegate quadrant belongs to whoever called the meeting, and the do-first quadrant belongs to nobody at all.

An item is important but I do not want to do it. Which quadrant?

Schedule, with a date and a time beside it like everything else in there. Wanting is not one of the two axes, and a task parked in the wrong quadrant because of how it feels will arrive in the urgent one later with less room to move.

Should the quadrants end up roughly balanced?

No. A sheet that is working is usually light in the top-left and heaviest under schedule, because most genuinely important work has no deadline attached to it yet. Four full quadrants means the list was too long for one sort rather than that the week is well balanced.

Related tools

Get It DoneCapture, triage and a weekly review, saved in your browserPrintable templatesThe other four sheets, including the weekly planner

ChronoClock is a free time and productivity toolkit. Personal tasks, focus sessions and plans are saved in this browser. Shared team rooms send content to our server so participants can collaborate. No account is required.

Sun and moon figures are computed astronomically and are approximate.

AboutGuidesTemplatesCountdownsPrivacyTermsContact© 2026 ChronoClock